A simple three-piece can be finished in as little as five business days. What happens on each of them, what adds days, and what you can use meanwhile.
Free in-home measure. No fee, no obligation.
Up to $2,500 in showroom design credit — book your measure by October 31. Showroom credit, no cash value.



A simple three-piece — toilet, vanity and shower staying where they are — can be finished in as little as five business days. A powder room or a tub-to-shower conversion is about two days; a four-piece ensuite or an accessible build about seven. Custom shower glass follows about a week later, because it is measured after the tile is on and then made to size; the room is finished and in use in the meantime. Whatever the room turns out to need, we finish within 7 business days of starting, in writing.
Day 1
The room is sealed off and protected, and everything comes out down to the subfloor. This is the day the surprises show up — mould behind the tile, a second floor laid over the first, plaster instead of drywall, a cast-iron tub that has to be broken up to leave — and the one day of the five that cannot be promised to the hour.
Day 2
Plumbing and electrical are roughed in — the shower valve, the fan and its duct to the outside, the GFCI receptacle — and inspected before anything closes them in. If the layout is changing, this is where the extra days go.
Day 3
The shower is built as a sealed assembly to Schluter standards — membrane, seams, corners and drain — and tested for leaks before a single tile goes on. Tiling starts only when the test passes.
Day 4
Floor and walls. Large-format porcelain and mosaic both take longer to set than a standard 12×24, which is why the tile you chose at the showroom decides more of this day than the size of the room does.
Day 5
Vanity, toilet, faucet, lighting, the shower door, silicone, and a clean. On a simple three-piece with a sliding door this is the last day, and the bathroom is yours that evening.
Week 2
A frameless enclosure is measured after the tile is on the wall — never from a drawing — then made to size and installed. That is about a week, and the room is finished in the meantime; the glass is the last thing in.
Bathroom renovations What a bathroom costs Questions to ask any bathroom contractor
The days are the shape of a typical simple three-piece, from our own bathrooms across the GTA; the promise is the 7 business days.
Before and after
Powder rooms, three-piece and four-piece bathrooms our crews rebuilt, photographed by us — the before shots are the same rooms, and each card says which kind of room it is. Tap any pair for the whole project.


3-piece · Ajax · 2 days on site · Tub out, walk-in shower in · custom tile · black-framed sliding glass · recessed niche · matte black fixtures


Powder room · Mississauga · 2 days on site · Two-piece refit · space-saving custom vanity · brushed-gold faucet and hardware · new toilet · fresh paint and trim


3-piece · Bolton · 7 days on site · Layout change · corner tub and stall out · one large walk-in shower · white double vanity with two backlit mirrors · new tile throughout
On site, most bathrooms run two to seven days; a large master ensuite can take ten. The time on each card is what that project actually took.
Built for complete renovations
We work with homeowners who want the room taken back to the studs and rebuilt by one team — waterproofing, tile, plumbing, electrical and glass — rather than finding a separate trade for each part of it.
All of it is included when we rebuild a bathroom. We just don’t sell any of it as a separate visit.
No fee and no obligation at any point before you have a written quote.





The part you never see again
A bathroom fails behind the tile, years later, where nobody can see it. So the shower is built as a sealed system first and finished second.
From our own channel.
The showroom is in Mississauga, but the crews work well past the GTA — Collingwood and Barrie to the north, out to Peterborough and Cobourg in the east, Kitchener and Brantford to the west, and down through Hamilton to Niagara.
Further out across the GTA depending on the size of the project — put your postal code in and we’ll tell you.
Has its own page - tap the pinWithin our service areaHover a town and the van drives there from the showroom.
A bathroom is the smallest room in the house and the most complicated one per square foot: plumbing, electrical, waterproofing, tile and glass all inside a space you can cross in two steps, and every one of them has to be right before the next one covers it up. Here is the honest version, from bathrooms we have built across the Greater Toronto Area.
Everything visible in a finished bathroom — the tile, the glass, the vanity — sits on top of the part that actually decides whether the room lasts. Tile and grout are not waterproof. A tiled shower needs a proper membrane system behind and beneath it, with the seams and corners treated, and the drain assembly matched to it. This is where cheap bathroom work goes wrong, and it goes wrong invisibly: the failure shows up two or three years later as a stain on a ceiling below, or as mould you have been breathing for years — a lot of the bathrooms we demolish have it on the drywall or the framing behind an old shower that was never properly waterproofed. If you are comparing quotes, ask each company what waterproofing system they use and how they treat the corners. The vague answers are informative.
Demolition first, back to the studs, because that is the only moment anyone can see what the last renovation left behind — and in an older GTA house it is routinely rotten subfloor or a stack that is not where the drawings say. Then any framing change, then plumbing and electrical roughed in while the walls are open and inspected at that point. Waterproofing next, then tile, then vanity, toilet, glass and fixtures. Glass is measured after the tile is on the wall, never before, because a shower opening is never quite as square as a drawing, and glass ordered from a plan is glass that arrives not fitting.
Keeping the toilet, tub and vanity roughly where they are is dramatically cheaper than moving them. A toilet in particular is fixed by a drain that runs through the floor structure, so moving it across the room means opening the floor and often the ceiling below. Swapping a vanity to the opposite wall is comparatively easy; moving the stack is not. It can be worth it — a bathroom you will use every day for fifteen years should not be arranged around where a pipe went in 1978 — but it is a decision to make deliberately at design, not one to discover in demolition.
Taking out a rarely-used tub and tiling in a proper shower is one of the most common things we are asked for, and in a three-piece it usually makes the room feel twice the size. The considerations are practical rather than aesthetic: a household with small children generally wants at least one tub somewhere, and resale in a family neighbourhood is easier with one bath in the house. If it is your only tub, think about it once more; if it is the second, it is usually an easy decision. A conversion is about two days on site.
Every bathroom needs mechanical ventilation, exhausted to the outside — not into the attic, which is the single most common fault we find when we open up somebody else's work, and the reason their ceiling paint keeps peeling. The fan has to be sized to the room and ducted properly. Separately, electrical work in a bathroom means an ESA inspection, and any new receptacle needs GFCI protection. Like-for-like fixture replacement generally does not require a building permit; moving a plumbing stack or adding circuits does.
This is the question people actually want answered, because unlike a kitchen there is often no substitute down the hall. A powder room or a tub-to-shower conversion is around two days on site. A standard three-piece taken back to the studs is about five. A luxury four-piece, or an accessible build with a level-entry shower, is around seven. Those are working days on site, and they assume the materials are all in before we start — which is why selections are finished at the quote stage rather than while the room is in pieces. We commit to finishing within 7 business days of starting, and there is a written guarantee behind that.