Bathroom renovations · GTA

What a bathroom renovation costs in the GTA

What moves the number, from bathrooms we have quoted and built. Six quick questions about your room, then a free in-home estimate with an exact, itemised price in writing.

Free in-home measure. No fee, no obligation.

Up to $2,500 in showroom design credit — book your measure by October 31. Showroom credit, no cash value.

HomeStars award winner 10 years running

  • EuroRenovations.ca, celebrating 30 years, since 1996
  • HomeStars Best of the Best Winner 2025
  • HomeStars Best of Award Winner 2024
  • HomeStars Best of Award Winner 2023
  • HomeStars Best of the Best Winner 2022
  • Best of Houzz Service 2021
  • Better Business Bureau accredited business, A+ rating
  • The whole EuroRenos team in the Woodbridge cabinet factoryOur own cabinet factory, Woodbridge
  • Bathroom display in the Mississauga showroom with two full-size walk-in showers and a freestanding tubFull-size bathroom displays, Mississauga
  • A bathroom taken back to the studs by our crewOur own crews on site, start to finish
  • 30years, since 1996
  • 3,000+projects completed
  • 5-yearwarranty, in writing

How much does a bathroom renovation cost in the GTA?

What moves a bathroom’s price is the size of the room, how much of it is tiled, and whether the toilet, tub or vanity moves to a different wall — moving the drain costs far more than any tile or fixture you could choose. Six quick questions tell us about your room; the exact price comes with the free in-home estimate — an itemised quote, in writing, from people who have built hundreds of them. Need more information first? Call us.

Your exact price
At the free in-home estimate
Written quote
After the free in-home measure
Typical time on site
2 to 10 days
On-time promise
7 business days, in writing

Bathroom renovations How long it takes, day by day What our warranty covers Financing options

Your written quote comes after we measure — itemised, in Canadian dollars.

Before and after

Before and after: real GTA bathrooms

Powder rooms, three-piece and four-piece bathrooms our crews rebuilt, photographed by us — the before shots are the same rooms, and each card says which kind of room it is. Tap any pair for the whole project.

On site, most bathrooms run two to seven days; a large master ensuite can take ten. The time on each card is what that project actually took.

Built for complete renovations

Replacing the whole bathroom? You’re in the right place.

We work with homeowners who want the room taken back to the studs and rebuilt by one team — waterproofing, tile, plumbing, electrical and glass — rather than finding a separate trade for each part of it.

What we take on

  • Complete bathroom renovations, back to the studs
  • Powder rooms and two-piece bathrooms
  • Tub-to-shower conversions
  • Accessible and barrier-free bathrooms
  • Ensuites and main bathrooms in the same visit
  • Moving the toilet, tub or vanity to a different wall
  • Waterproofing, tiling, glass, vanities and fixtures

What we don’t do on its own

  • Re-grouting or re-caulking
  • Swapping a single toilet, vanity or faucet
  • Bathtub reglazing, resurfacing or liners
  • Chasing a leak or a standalone repair
  • Small handyman work

All of it is included when we rebuild a bathroom. We just don’t sell any of it as a separate visit.

How the work happens

No fee and no obligation at any point before you have a written quote.

  1. A homeowner going through a design at the showroom desk with two of our team, the tile samples on the wall behind
    01No fee, no obligation

    Plan and measure

    Five questions online tell you straight away whether we are the right company, and a call confirms the scope before anyone books a visit. Then a free in-home measure: Orest — our bathroom and basement specialist — runs most of them, Joe the rest. Whoever comes measures properly and looks at what the old bathroom is hiding: where the drain and stack actually run, the state of the subfloor, whether there is water damage behind the tile.

  2. Bathroom display in the Mississauga showroom: marble-look tile with black fixtures, a freestanding tub and a glass shower
    02Showroom, by appointment

    Choose materials and confirm the scope

    Layout, tile, vanity, glass and fixtures, seen at full size in the Mississauga showroom rather than on a screen. Then a written scope and quote — itemised, with the work and the inclusions spelled out — so you can compare it fairly against anyone else before you commit to anything.

  3. One of our tilers setting the last marble-look wall tiles in a shower with a recessed niche, the hex mosaic floor already down
    032–7 days on site · 7 business days in writing

    Build and hand over, on a promised date

    A powder room or a tub-to-shower conversion is about two days on site, a standard three-piece about five, and a luxury four-piece or an accessible build about seven. We finish within 7 business days of starting, or the guarantee applies.

A crew member screwing waterproof XPS-TEK backer board to the shower walls, the ceiling already boarded A large-format porcelain tile being scored on the rail cutter, the floor protected Setting a wall tile with a suction cup, the spacers in One of our crew fitting a white vanity under the window of a finished bathroom, the tile already down
Illustration of the waterproofing stage: orange sheet membrane over the shower walls, curb and floor, the pan sloped to a central drain, before any tile goes on
Before any tile goes on: the walls, curb and floor sheathed in waterproofing membrane, the pan sloped to the drain, then flood-tested for leaks. That is the work the tile hides.

The part you never see again

A shower that stays dry behind the tile — tested for leaks before a single tile goes on

A bathroom fails behind the tile, years later, where nobody can see it. So the shower is built as a sealed system first and finished second.

  • Built to Schluter standards. Every shower is constructed as a waterproof assembly to Schluter’s specification — membrane, sealed seams and corners — rather than moisture-resistant board and hope.
  • Tested before tiling. The assembly is tested for leaks before any tile is set. Tiling starts only when the test passes, because a leak found afterwards means taking the finished wall apart.
  • cUPC-certified fixtures and fittings. The plumbing products we install carry cUPC certification for Canadian use, and the work is done by our own certified plumbers to meet or exceed the Ontario Building Code.
  • Covered for five years. The labour-and-materials warranty runs five years, and it is written by the people who built the shower — there is no installer to point at, because the installer is us.
Warranty and insurance, in writing

Real bathrooms, real customers, on camera

From our own channel.

A bathroom review from Ajax

A real customer, on camera, about their bathroom renovation.

A bathroom renovated in 10 days

10 days on site

The homeowner talks through the ten-day renovation.

Before & after: an en-suite bathroom

One en-suite, filmed from the dated original to the finished room.

An accessible bathroom, walked through

Barrier-free shower, grab bars and slip-resistant flooring on camera.

Where we work

The showroom is in Mississauga, but the crews work well past the GTA — Collingwood and Barrie to the north, out to Peterborough and Cobourg in the east, Kitchener and Brantford to the west, and down through Hamilton to Niagara.

And 46 more towns we cover

Further out across the GTA depending on the size of the project — put your postal code in and we’ll tell you.

Map of the area Euro Renovations covers, marked from the Mississauga showroom: north to Collingwood, Barrie and Lindsay, east to Peterborough, Cobourg, Oshawa and Whitby, west to Guelph, Kitchener, Cambridge and Brantford, and south around Lake Ontario through Hamilton and St Catharines to Niagara Falls. MississaugaWe work hereTorontoWe work hereEtobicokeWe work hereBramptonWe work hereOakvilleWe work hereBurlingtonWe work hereMiltonWe work hereVaughanWe work hereRichmond HillWe work hereMarkhamWe work hereAjaxWe work hereAncasterWithin our service areaAuroraWe work hereBarrieWe work hereBoltonWe work hereBowmanvilleWithin our service areaBrantfordWithin our service areaCaledonWe work hereCambridgeWe work hereCobourgWithin our service areaCollingwoodWithin our service areaEast YorkWithin our service areaGeorgetownWithin our service areaGrimsbyWe work hereGuelphWe work hereHamiltonWe work hereInnisfilWithin our service areaKing CityWithin our service areaKitchenerWe work hereLindsayWithin our service areaNewmarketWe work hereNiagara FallsWe work hereNorth YorkWe work hereOrangevilleWithin our service areaOshawaWe work herePeterboroughWithin our service areaPickeringWe work herePort PerryWithin our service areaScarboroughWe work hereShelburneWithin our service areaSt CatharinesWe work hereThornhillWe work hereUxbridgeWithin our service areaWaterlooWe work hereWhitbyWe work hereWoodbridgeWithin our service area

Has its own page - tap the pinWithin our service areaHover a town and the van drives there from the showroom.

What actually drives the price

Bathrooms are the room people most often get quoted for and least often get a straight answer about, partly because the range is genuinely wide — the same three-piece can cost close to twice as much as another depending on decisions that are not obvious when you are standing in it. Everything below is read from our own estimate book; your own exact price comes with the free in-home estimate, which six quick questions above book.

+10 Read the full guide — 10 stages
  1. 1

    The short answer, from 189 quotes

    Three things set the price before any tile is chosen: which bathroom it is (a powder room, a three-piece, a four-piece master), what goes in the wet area (a ready-made acrylic base or tub, or a tiled shower with custom glass), and whether the toilet, tub or vanity moves to a different wall. The bathrooms customers actually go ahead with cluster at the lower end of what we quote; the top of the book is spa-style ensuites, freestanding tubs, full-height slab, heated floors, or two bathrooms at once. Your own exact price comes with the free in-home estimate — six quick questions on this page book it.

  2. 2

    Can you renovate a bathroom on a tight budget?

    A powder room, yes — outright, with room left for a better vanity and tile: a two-piece, toilet and vanity, with no shower or tub, done properly. A complete three-piece, not cheaply, with us or anyone: nothing with a shower or a tub in it comes down far, because the waterproofing, the tiling and the glass are where a bathroom's cost lives, and none of them get smaller because the budget did. The lowest quarter of our three-piece quotes are nearly all the same room: an acrylic shower base and walls or an acrylic tub, standard tile, the toilet, vanity and shower staying where they are, and a vanity from the catalogue. A complete three-piece quoted far below that usually has something left out — the waterproofing system, the disposal, the ESA inspection or the glass — so ask which.

  3. 3

    What is the biggest expense in a bathroom renovation?

    The shower. In our book, the wet area separates the cheap bathrooms from the expensive ones more than anything else: a three-piece with a fully tiled shower and custom glass is quoted at roughly three-quarters more than the same three-piece with an acrylic shower. The difference is tile setting, waterproofing, a tiled base and the glass, and nothing on the vanity side comes close. Of the most expensive quarter of our three-piece quotes, 84% have a custom glass shower; of the cheapest quarter, none do. Two other things appear in the expensive quarter far more often than in the cheap one: added scope — a new fan and duct, extra electrical points, a plumbing fixture moved or added — in about half of them against one in six, and finish upgrades in four out of five against just over half.

  4. 4

    What does the starting-price three-piece look like?

    A three-piece — toilet, vanity, shower — with an acrylic shower base and walls, tile on the floor and to standard height, the fixtures where they were, a vanity from the catalogue, and the same waterproofing, ESA inspection and five-year warranty as a bathroom at twice the price. In the cheapest quarter of our three-piece quotes every bathroom has an acrylic wet area, about one in thirty moved a plumbing fixture, and roughly half added one finish upgrade. It is also what most of the bathrooms we have actually built look like.

  5. 5

    What does a small bathroom renovation cost?

    The same as a bigger one with the same things in it, because we price what is in the room, not its floor area. The most common small bathroom in a GTA house is a three-piece close to five feet by eight, and it is priced like any other three-piece with an acrylic shower or tub. A small room does not make the shower cheaper — the waterproofing, the glass and the plumbing are the same size — which is why a compact ensuite with a tiled shower and custom glass still costs what a larger one does. Powder rooms are the exception, because they have no wet area at all.

  6. 6

    Why does moving the toilet or the drain cost so much?

    Because a toilet is fixed by a drain running through the floor structure — moving it across the room means opening the floor and usually the ceiling below. Keeping the toilet, tub and vanity roughly where they are is dramatically cheaper than moving them. Swapping a vanity to the opposite wall is comparatively easy; relocating the stack is not. About one three-piece quote in five in our book moves or adds a plumbing fixture, and in the cheapest quarter it is one in thirty — the measure is where it gets talked through. A homeowner choosing between a nicer tile and keeping the layout is almost always better off keeping the tile budget and the existing layout, because the layout change costs multiples of the tile upgrade.

  7. 7

    Where does the money actually go?

    Not where most people expect. The fixtures you can point at — toilet, vanity, faucet — are usually the smallest part. The cost is in labour and in the things that get covered up: demolition and disposal, any rotten subfloor found underneath, waterproofing the wet area properly, and the tile setting itself. Tile is priced by the hour it takes to set, not by the box, which is why large-format porcelain and mosaic both cost more to install than a standard 12×24 — one is heavy and unforgiving of an out-of-square wall, the other is mostly grout lines. Glass is the other quiet line: a framed door and a frameless panel are not close in price.

  8. 8

    What should a bathroom quote include?

    Ask for it itemised, and check for these specifically, because they are what separates a quote from a quote that grows by a quarter once the work starts: demolition and disposal; the waterproofing system by name; an allowance for subfloor repair, since nobody knows what is under there until the tile is off; the ventilation fan and its duct to the outside; the ESA inspection if any electrical is being changed; and the glass, measured after tiling rather than ordered from the drawing. A quote that omits the subfloor allowance is not cheaper — it just moves that conversation to the middle of the job.

  9. 9

    Why isn’t a bathroom just a small kitchen?

    People assume a bathroom should be a fraction of a kitchen because it is a fraction of the floor area, and the arithmetic does not work that way. Per square foot a bathroom is the most expensive room in the house: every one of the trades a kitchen needs is present, in a space you can cross in two steps, plus waterproofing that a kitchen does not require at all. What you save is time rather than intensity — a three-piece is about five days on site against two to five weeks for a kitchen, and a powder room or a tub-to-shower conversion is about two.

  10. 10

    What don’t you quote?

    We do not price re-grouting or re-caulking on its own, single-fixture swaps, bathtub reglazing or liners, or standalone repairs and leaks. All of it is included when we rebuild a bathroom; none of it is something we come out to do by itself, and a tiler or plumber will do it sooner and for far less. Saying so here rather than after a visit is deliberate — it is the same reason the fit check on this page asks about scope before it asks who you are.