Whole-home renovations · GTA
Real published figures for the parts — kitchens and bathrooms — and a plain explanation of why we will not add them up for you.
Free in-home measure. No fee, no obligation.
4.95/5 from 335 HomeStars reviews · award winner 10 years running



There is no published figure, and the reason is arithmetic. Adding our kitchen floor to our bathroom floor produces a number nobody has ever been charged. The parts are real and checkable: kitchens from $20,000, bathrooms from $4,000 for a powder room and $14,499 for a three-piece. Your quote is one contract itemised by room, written after we measure every room in scope.
Whole-home renovations What a kitchen costs What a bathroom costs
Component figures come from our own quoted and completed kitchens and bathrooms across the GTA. There is no whole-home figure because every one we have written was the rooms in a specific house, measured and itemised.
Built for multi-room projects
Most of the expensive problems in a multi-room renovation happen between the trades rather than inside any one of them. When the same company designs, builds and installs every room, there is nobody to point at and nothing to coordinate.
A basement on its own is FinishedBasement.ca’s job — the same team, under the brand that holds the HomeStars record for that work. In a whole-home project you get that crew anyway, because it is the crew that runs these builds.
No fee and no obligation at any point before you have a written quote.
The boring, important part
Ask us for any of it in writing before you sign anything — with us or with anyone else.
The showroom is in Mississauga and the cabinets are built in Woodbridge, but the crews work well past the GTA — Collingwood and Barrie to the north, out to Peterborough and Cobourg in the east, Kitchener and Brantford to the west, and down through Hamilton to Niagara.
Further out across the GTA depending on the size of the project — put your postal code in and we’ll tell you.
Has its own page - tap the pinWithin our service areaHover a town and the van drives there from the showroom.
We publish what a kitchen starts at and what a bathroom starts at, because both are real figures from books of real jobs. We do not publish a whole-home figure, and this is the honest explanation of why — along with the parts that are checkable, and the four things that move a multi-room number more than anything else.
A whole-home price would have to be assembled by adding a kitchen quote to a bathroom quote and calling the result a price. It is not one — nobody has ever been charged it. Every whole-home quote we have written was the rooms in one specific house, measured and itemised, and the total was whatever those rooms came to. The number exists after the measure, not before it.
A complete kitchen starts at $20,000. A bathroom starts at $4,000 for a powder room, around $14,499 for a three-piece taken back to the studs, and around $24,000 for a four-piece master ensuite. Those come from books of jobs we have actually quoted and built, and they are the same figures published on the kitchen and bathroom pages.
A multi-room quote is not only rooms. Flooring that runs continuously through the space, lighting, paint, doors and trim, stairs, and structural work like taking a wall out all sit between the rooms rather than inside one. On a single-room job most of that does not arise; on a whole floor it can be a meaningful share of the total.
How many rooms, obviously. Whether the layout changes — moving plumbing and electrical costs more than replacing what is there. Whether anything structural moves, which brings an engineer, a permit and an inspection with it. And whether you are living in the house, because working around a household is slower than working in an empty one. Finish level matters too, but usually less than any of those four.
It saves on mobilisation and on trades: one set of visits, one delivery, one crew that is already on site and already knows the house. What it does not do is cut the material cost or the labour inside each room. Anyone promising a large percentage off for bundling rooms is discounting something they were going to do anyway — ask what, specifically, and see whether the answer survives.
One written scope and one contract, itemised by room. You can see what each part costs, compare the whole thing against anyone else fairly, and defer or drop a room without unpicking the rest. There is no fee and no obligation at any point before you have it.
Appliances are yours to buy — we install what you choose. Permit fees are set by your municipality and charged on top of the quote rather than buried in it. Anything discovered once walls are open is priced as a change before the work happens, never after.